Labels:text | font | diagram | black and white | screenshot | document OCR: NSTS 17462-50 Revision H NSTS 21136 Shuttle Amateur Radio Experiment II (SAREX-II) PIP and Annexes 1, 2, 3, 6, and 9 Ref: Paragraph 3.2 NSTS 21193 Ultraviolet Plume Instrument (UVPI) PIP Ref: Paragraph 3.2 TDDPF50 Trajectory Design Data Package Ref: Paragraph 3.5 Crew Compartment Configuration Drawing Ref: Paragraph 3.2 MECSLSI Ref: Paragraph 3.2 3.0 PRIMARY FLIGHT REQUIREMENTS Flight Definition and Requirements Directive (FDRD) controlled requirements are indicated by an asterisk (*). 3.1 General Flight Requirements - a. Launch Date: June 25, 1992* b. Launch Window: The launch time on June 25, 1992, is 16:07 GMT. The launch window is 3 hours and 7 minutes. (Operationally limited to 2 hours and 30 minutes based on crew-on-back constraint.) Detailed launch window information is included in ...